Case Studies





Sample parts being run on our integrated lines for Honda & GM


Honda part XXXXX- R36Y-0000 with ±.004mm diameter tolerance

• Material: Hardened steel 1215
• Cycle Time 8.0sec. per part
• Typical efficiency 80-90%
• Typical set-up time 2 to 4hrs for complete line

GM part XXXX 3653 with ±.004mm diameter tolerance

• Material: Aluminum 62SN
• Cycle time 2 parts every 6.0sec.
• Typical efficiency 80-90%
• Typical set-up time 2 to 4hrs for complete line

Back to top